Tui-Borne Paint Automatic Painting Line hmanga siam a ni

Tui-Borne Paint Automatic Painting Line hmanga siam a ni

Kimchang
Water-borne paint automatic painting line hi industrial finishing system a ni a, high-volume automotive component siamna atana eco-friendly coatings-a viscosity sang leh humidity khauh tak mamawh te enkawl thei tura engineer a ni.
Bithliahna
In chhung lam Parts te
 
Inquiry thawn rawh .
Hrilhfiahna
Technical Parameters 1000 a ni.

Inhmelhriattirna

 

Water-borne paint automatic painting line hi industrial finishing system a ni a, high-volume automotive component siamna atana eco-friendly coatings-a viscosity sang leh humidity khauh tak mamawh te enkawl thei tura engineer a ni.

 

Water-Borne Paint Automatic Painting Line

 

Technical lam thil chi hrang hrang

 

Parameter a ni

Specification chungchang chipchiar takin

System Configuration chungchang

Monorail / Power & Free chhunzawm zel tur a ni a, Climate-Controlled Booths a awm bawk

Thil siam chhuah theihna

Darkar khatah Hna 30 atanga 100 (JPH, Layout a zirin Customizable)

Coatings hman tur te

Tui-Borne Basecoat, Tui-Reducible Primer, & Polyurethanes te hi a ni

Robot hmanga inzawmkhawmna

ABB, FANUC, emaw Yaskawa Explosion-Proof Paint Robot te chu Insulated Circuit nei te an ni

Spray Booth boruak awm dan

23℃± 1 degree-a lum leh vawt control; 65% ± 5% relative humidity tihdanglam a ni

Fluid Circuit hmanrua a ni

Passivated 304/316 Stainless Steel hmanga siam a ni a, Corrosion laka invenna atan hman a ni

Curing Technology hmanga tihdam theihna

Tunnel + Multi-Zone Convection / IR Ovens atanga boruak lum-Air Flash-off rei tak

Electrical hman dan tur ruahmanna siam a ni

CE Certified, ATEX Explosion-Proof Enclosures, PLC/SCADA Control hmanga siam a ni

 

Process Workflow (Tui-Borne Coating kalpui dan) 1.1.

 

Tui-borne paint automatic painting line-a operational sequence hian continuous, precision-controlled automated workflow a zawm a:

 

Raw Part Loading & Jigging te a awm bawk Chemical Pre-treatment & DI Rinsing hmanga tihfai a niDe-hydration & Thermal Flash-off tih a niKhaw lum leh khaw vawt-Controlled Spray Booth (Tui-Borne Application)Tunnel atanga Warm-Air Flash-a tihzauhA rilru a buai em em a, a rilru a hah em em bawk a. IR & Convection Ovens) .Forced Cooling & Unloading tih a ni

 

Raw Part Loading leh Jigging te hi a awm lo.ergonomic mounting chu customized tooling leh conveyor-ah stable positioning leh grounding atan hman a ni.
Chemical Pre-Treatment & DI Rinsing hmanga tihfai dan:Multi-stage cleaning hmangin degreasers, nano-ceramic coatings, leh DI rinses te hmangin adhesion tha ber a awm theih nan.
De-hydration & Thermal Flash-off tih hi a awm lo.Oven passage chu drying la, residual moisture paih chhuakin component temperature stabilize rawh.
Khaw lum leh khaw vawt-Controlled Spray Booth :Tui-borne application environment khauh tak, temperature (22℃atanga 25℃) leh humidity (60% atanga 70%) control khauh tak nei.
Tunnel atanga Warm-Air Flash-a rei tak :Tui awm zat paih chhuah nan leh baking hmaa a chunglam chhiatna awm lo turin boruak lum-meh zawi zawia tihthianghlim.
Thermal Curing hmanga tihdam theih ] .Zoned IR pre-heating leh hot-air convection ovens te chu full resin polymerization leh durability neih theih nan.
Forced Cooling & Unloading hmanga tihlum tur : 1.1.Safe cooling tunnel hmangin parts te chu ambient temperature ah enfiah leh assembly atan a rawn hruai thin.

 

OEM / Customization theihna te

 

Customization Dimension a ni

Engineering duhthlan tur awmsa

Target Dilna / Hlawkna

Plant Layout siamthat dan tur

U-Shape, L-Shape, emaw Linear Multi-Tier configuration te hi a awm thei

Brownfield emaw greenfield factory space khap tlat-ah space hman a tipung

Substrate Flexibility a awm thei

Quick-lock fixtures leh dual-recipe PLC software inthlak danglam theih a ni

Plastic part, metal stamping, leh composite substrate mixed batch te a awm thei

Automation Scaling hmanga tih a ni

Robot cell pakhat-arm hmanga multi-arm synchronous robotic tracking array siam

Production throughput 30 atanga 100+ Jobs Per Hour (JPH) thleng a scale

Fluid Delivery Integration hmanga tihchhuah a ni

Pigging recovery system leh automated multi-color change manifold te a awm bawk

Solvent flush waste a tihtlem bakah second 45 chhungin color switching rang tak a ti thei bawk

 

Factory Layout & Integration tih theih dan tur

 

U-Shaped & L-Shaped Layout hrang hrang:Space-saving efficiency atana duan a ni a, pre-treatment, painting, curing thlenga flow optimizing a ni.
In-Line Cleanroom inzawmkhawmna:Cleanroom-compatible design options (ISO Class 7/8) te chu dust-sensitive clear coat zone te tan a ni.
Modular hmanga tihzauh theihna:Scalable architecture hmanga nakin lawka spray booth awlsam taka dah theihna tur emaw, i production mamawh a pun zel angin curing capacity tihpun theihna tur.

 

Water-Borne Paint Automatic Painting Line
Water-Borne Paint Automatic Painting Line

 

Quality Assurance & Compliance (QA) hmanga thil tih dan tur (QA) .

 

Factory-a pawm dan tehna (FAT): 1.1.Thil thawn chhuah hmaa climate control stability, automation logic, leh electrical safety interlocks te simulation kimchang tak neih a ni.
Tier-Component pakhat Sourcing:Khawvel pum huapa hriat hlawh pneumatic, hydraulic, leh electrical hardware te inzawmkhawm (Siemens, Festo, Schneider, ABB).
Safety Standard zawm dan tur:CE safety directives, ATEX hazardous-area explosion-proof regulations, leh NFPA kangmei venna standards-a khauh taka siam a ni.

 

Packaging & Logistics te a awm bawk

 

Hermetic Moisture Barrier hmanga tihbuai theihna:Precision robot controller, electrical cabinet, leh stainless steel fluid manifold te chu anti-static barrier bag-ah desiccant hmanga vacuum-sealed a ni.
A rilru a buai em em a, a rilru a hah em em bawk a.Fumigated wooden crates nghet tak tak leh structural steel skids te hian ventilation duct rit tak tak, AHU module leh conveyor track te chu tuifinriat kaltlanga shock lakah a humhim a ni.
Khawvel pum huapa bungraw phurh enkawl dan:Oven leh AHU section lian tak tak tan standard 40-foot High Cube container emaw specialized open-top vessel hmanga shipping support kimchang.

 

FAQ

 

Q: Engvangin nge tui-borne paint line-te hian spray booth-ah climate control bik a mamawh?

A: Tui-borne coatings hian latent heat of vaporization sang tak a nei a, ambient humidity lakah pawh a sensitive hle. Temperature (23∘C) leh relative humidity (65%) khauh taka control hian viscosity a awm reng a, leveling a ti awlsam a, run emaw sags emaw a veng bawk.

Q: Tui-borne paint i hman hian engtin nge fluid delivery system-a corrosion i ven theih ang?

A: Wetted component zawng zawng-fluid line, regulator, pump, fitting, leh mixing manifold-te pawh hi pasivated 304 emaw 316 stainless steel atanga siam vek a ni a, chu chuan rust leh chemical degradation a ti bo thei a ni.

Q: Standard electrostatic spray gun hi tui-borne paint nen hman theih a ni em?

A: Standard direct-charge electrostatic systems hian conductive water-borne paint-ah electrical grounding issue a siam thin. Electrostatic transfer him leh nghet tak neih theih nan a bik taka siam isolated fluid supply system emaw insulated bell-cup applicators emaw kan inzawm khawm a ni.

Q: Engvangin nge thermal curing hmain extended flash-off tunnel hi a tul?

A: Tui-borne paint te hian high-temperature baking ovens-a an luh hmain film atanga tui awm zat a vawt theih nan hun remchang a mamawh a ni. Extended, warm-air convection flash zone hian surface skinning leh micro-blistering a veng thei a ni.

Q: Robot leh electrical component te hi paint environment hlauhawm tak tak awmna tur certified an ni em?

A: Ni e. Spray booth chhung emaw, a bula awm robot arm, motor, proximity sensor, leh electrical enclosure zawng zawngte chu ATEX leh NFPA explosion-proof standard-a certified kim vek an ni.

Q: He system-a typical production capacity (JPH) hi engzat nge ni?

A: Standard modular line te hi production speed 30 atanga 100 Jobs Per Hour (JPH) thlenga engineer a ni a, custom high-speed configuration pawh dilna angin a awm bawk.

Q: Installation, commissioning, leh handover zawh hian eng chen nge hun a duh?

A: On-site mechanical erection, electrical wiring, robot path teaching, leh system commissioning te hi project scale a zirin kar 8 atanga kar 16 inkar a ni tlangpui.

Q: Eng ang post-installation support leh training nge i pek?

A: Commissioning neih chhung hian on-site operational leh programming training kimchang kan pe a, 24/7 remote PLC diagnostic support leh global spare parts delivery rang takin kan thlawp a ni.

 

hot tags .: tui-borne paint automatic painting line, China tui-borne paint automatic painting line siamtu, supplier, factory

Inquiry thawn rawh .